Fire stopping installation

The products only work if they are fitted the way they were tested. That is most of the job.

  • Every seal labelled and photographed
  • BM TRADA / FIRAS-certificated contractors
  • Written price before any work
Get a price

We reply with a written price.

We use these details to reply to you. See our privacy notice.

Every fire stopping product is tested in a furnace in a particular arrangement. A batt of a stated thickness, in a wall of a stated type, round particular services, with a stated amount of sealant at the edges. The test result only covers that arrangement. Installation means copying it on site, hole after hole.

The same vertical joint in blockwork filled and finished with white fire-rated sealant
The same vertical joint in blockwork filled and finished with white fire-rated sealant

What a day of installation looks like

Here is a made-up example to show the order of work. A corridor on the second floor of a block in Southwark has nine numbered breaches from the survey. The contractor brings the batt, the mastic, two sizes of collar and the labels.

Breach 21: cable tray through block wall, opening 300 by 150. Old foam cut out, batt cut in two pieces round the tray, edges and cables sealed with mastic. Label 21, photo 21.

Breach 22: 110mm plastic soil pipe through the same wall. Collar on each face, fixed with steel anchors. Label 22, photo 22.

Breach 23: open joint at the wall head, 4 metres long, 15mm wide. Mineral wool backing to depth, mastic on both faces. Label 23, photos 23a and 23b.

And so on along the corridor. At the end of the day each number on the survey has a matching label on the wall.

Products

Batt, collars, wraps, mastics and boards come from the big tested ranges. The contractor picks from the survey which product suits each hole, and the data sheet for each is kept with the record.

Records you keep

A schedule of every seal with its number, location, product, rating and photo. Your fire risk assessor reads this to close the action. A future contractor reads it to see what not to disturb.

Installation is carried out by our BM TRADA / FIRAS-certificated contractors. Jobs usually start at around £2,000 plus VAT.

Need the holes counted and sealed?

Send the postcode, the type of building and a photo or two. We will tell you whether it needs a survey first and what the sealing is likely to cost.

Call 020 3376 6178Get a quote