Fire stopping in Elephant and Castle
Tall new blocks, mixed-use schemes and the estates that were there before.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
Elephant and Castle has changed more than anywhere else in Southwark. The Heygate Estate has gone and Elephant Park has taken its place. The old shopping centre closed in 2020 and the site is being rebuilt. Strata SE1, the tower with wind turbines in its top, went up in 2010. Many of the newer buildings are tall.

Tall buildings
A block with at least two flats that is 18 metres or more, or seven storeys or more, is a higher-risk building under the Building Safety Act 2022. Its accountable persons have to keep information about how fire safety is maintained. For compartmentation that means knowing where the seals are and what state they are in. A labelled, photographed schedule is the simplest way to show it.
After handover
New towers are well sealed on the day they open. Then the building is lived in. Residents change kitchens. Shops on the ground floor fit out. A new phone mast goes on the roof and its cables come down a riser. Each is a chance for a seal to be broken. A periodic check of the risers against the handover record finds those breaks.
What gets found
The photo shows pink foam pushed over a wire tray where it meets the head of a wall. That is not the sort of seal a tested system allows, and it is the sort of thing that turns up after a service contractor has been through.
Our BM TRADA / FIRAS-certificated contractors carry out fire stopping round Elephant and Castle.
Send the postcode, the type of building and a photo or two. We will tell you whether it needs a survey first and what the sealing is likely to cost.